Cover Meter Non-Destructive Testing

NABL Accredited  ·  ISO/IEC 17025

Accredited Lab
Cover Meter Testing — Site & Equipment Gallery
Equipment

Profometer Cover Meter Kit

Proceq Profometer cover meter instrument in its carry case — calibrated and ready for rebar detection and concrete cover measurement per BS 1881 (Part 204).

Bridge Soffit

Cover Meter — Bridge Soffit

Engineer on scaffolding applying cover meter sensor overhead to bridge/underpass soffit — detecting rebar position and measuring concrete cover depth.

Column Testing

Cover Meter — Column Wall

Engineer scanning concrete column wall with orange-grid marking using Bosch rebar detector — locating reinforcement before cover depth readings.

1/3
Retaining Wall

Cover Meter — Retaining Wall

Technician scanning a retaining / basement wall using Bosch cover meter — locating rebar and recording cover depth at chalked grid points.

Footing Testing

Cover Meter — Slab / Footing

Close-up of Bosch cover meter on a concrete footing / plinth — precise rebar detection for cover depth measurement at footing level.

Witnessed Testing

Cover Meter — Client Witness

Site team and client representatives witnessing cover meter test on a concrete column — real-time reading displayed on the Elcometer instrument.

1/3
Slab Survey

Cover Meter — Floor Slab

Technician scanning concrete floor slab with Bosch D-tect cover meter — measuring reinforcement cover over a large slab area.

Scaffolding Survey

Cover Meter — Column (Scaffolding)

Engineer on scaffolding performing cover meter survey on a concrete column with pink-chalk grid — systematic point-by-point rebar depth recording.

Column Survey

Cover Meter — Column Full View

Full view of cover meter survey in progress on a concrete column at height — grid-marked surface with Elcometer instrument giving live readings.

1/3
Scope of Laboratory
NABL Accredited Laboratory

Scope of Laboratory

S.No Discipline / Group Materials or Products Tested Component / Parameter / Characteristic Tested & Specific Test Performed Test Method Specification / Technique / Equipment
Non-Destructive — Building Materials & Reinforced Concrete Structures
1 NDTBuilding Materials — Reinforced Concrete Structures Reinforced Concrete Structures Cover Meter BS 1881 (Part 204)
Recently Completed Projects
Our Track Record

List of Recently Completed Projects

Sr.No Name of Project Client Name Location
1 NHIT NHAI Muzaffar-Nagar
2 Tata Microsoft Tata Project Sec-145 Noida
3 MAX MAX Sec-16 Noida
4 Godrej Nature Plus Godrej Sec-33, Sohna, Gurugram
5 Gail India Gail India Ltd. Bathinda, Punjab
6 M3M M3M Sec-94 Noida
7 Dwarka Railway Station Dwarka Railway Station Dwarka Railway Station, Delhi
8 Smartworld Sky Arc Smart World Developer Sec-69, Gurugram
9 Vegus Mall Vegus Mall Sec-14 Dwarka, Delhi
10 Elan Paradise Elan Sec-50, Gurugram